Platinum

Client – Details to come

Architect – Details to come

Builder – Details to come

Year – Details to come

Construction Cost – $Details to come

Lorem ipseum etc – Details to come

The key structural engineering features of this project are:

  • Details to come
  • Details to come
  • Details to come
  • Details to come

Thornton Central

Client – Details to come

Architect – Details to come

Builder – Details to come

Year – Details to come

Construction Cost – $Details to come

Lorem ipseum etc – Details to come

The key structural engineering features of this project are:

  • Details to come
  • Details to come
  • Details to come
  • Details to come

Highbury Rise

Client – Details to come

Architect – Details to come

Builder – Details to come

Year – Details to come

Construction Cost – $Details to come

 

Lorem ipseum etc – Details to come

 

The key structural engineering features of this project are:

  • Details to come
  • Details to come
  • Details to come
  • Details to come

Atlas and Savannah

Atlas Apartments

Client – Sekisui House

Architect – Turner Associates

Builder – Parkview Construction

Year – Completed in 2015

Construction Cost – $40,000,000

The Atlas Apartments represented Stage A of a multi-stage development at Wentworth Point, NSW for Sekisui House. Structural Design Solutions was brought on board by the builder, Parkview, as part of a D&C to provide faster, more cost-effective design. The engagement includes structural design documentation.

The key structural engineering features of this project are:

  • 185 apartments
  • 10 levels above ground
  • Three buildings on a common podium
  • Concrete framed building with Post-tensioned slabs

 

Savannah Apartments

Client – Sekisui House

Architect – Turner Associates

Builder – Parkview Construction

Year – Completed in 2015

Construction Cost – $40,000,000

 

The Atlas Apartments represented Stage C of a multi-stage development at Wentworth Point, NSW for Sekisui House. Structural Design Solutions was brought on board by the builder, Parkview, as part of a D&C to provide faster, more cost-effective design. The engagement includes structural design documentation.

 

The key structural engineering features of this project are:

  • 230 apartments
  • 21 levels above ground
  • Three buildings on a common podium
  • Concrete framed building with Post-tensioned slabs

Naisoso Bridge

Client – Reicorp Fiji

Project Manager – Eastview

Year – Completed in 2010

Construction Cost – $3,500,000 (Fiji Dollars)

 

The Naisoso Island project involved the development of a Master-planned island resort. Included in the works was the raising of the island’s levels to above flood levels, and developing 5- and 4-star hotels, boutiques, a day spa and a marina. As part of the early works package, an access bridge was required to be constructed. An existing design by another consulting firm had a bridge with a construction budget of $5,500,000 (Fiji dollars). Through our innovative design concepts, Structural Design Solutions was able to fully design and construct a new bridge with a total construction cost of $3,500,000 (Fiji dollars), saving the client $2,000,000 (Fiji dollars).

 

The key structural engineering features of this project are:

  • Removing all retaining walls
  • Reducing pile numbers by half
  • Incorporating more-economical pre-tensioned beams
  • Simplifying Pier Support design

Somerset College

Client – Somerset College

Architect – TVS Architects

Builder – Condev

Project Manager – East View Australia

Year – Completed in 2013

Construction Cost – $5,000,000

 

The Student Services Building houses the school’s house groups, head of house teachers and associated amenities and offices. The completed Design includes creation of a central courtyard with tiered seating for outdoor meetings and lectures. This building is the central hub for the senior/middle year cohort. The building links to existing teaching areas at multiple levels and embraces the central courtyard space that these buildings create.

 

The key structural engineering features of this project are:

  • Placing foundations to avoid key school services
  • Excavation adjacent to existing school buildings
  • Concrete framed building with reinforced slabs
  • Clear open spans on ground floor

Urbanest

Client – Urbannest

Architect – Bates Smart

Project Manager – Buildcorp

Year – Completed in 2014

Construction Cost – $30,000,000

 

This is one of several Urbannest rollouts around Sydney. Engaged by Buildcorp as part of a D&C team, Structural Design Solutions were brought on board to provide faster, more cost-effective designs. Our deign helped Buildcorp win the tender. Structural Design Solutions were then engaged for full structural design documentation.

 

The key structural engineering features of this project are:

  • 13 levels of student accommodation
  • Retention of neighbouring buildings
  • 1 basement
  • Building over Heritage sewer
  • Incorporating the Heritage St Michael’s Church
  • Concrete framed building with Post tensioned slabs

Synergy

Client – Amalgamated and Morris Property Group

Architect – DBI

Builder – Morris Construction

Year – Construction in 2014/2015

Construction Cost – $43,000,000

 

Synergy has three basement levels in addition to 25 levels of residential apartments. The building will be a post tensioned and reinforced concrete structure, which will also be heavily reliant on precast to achieve the seminally random appearance of the building façade. Geotechnical investigations, wind modelling and advanced modelling core design have been invaluable to achieving an economical and buildable structural outcome. Structural Design Solutions have been engaged for full structural and civil design documentation.

 

The key structural engineering features of this project are:

  • 25 Level Tower
  • 3 basements in water charged ground
  • Concrete framed building with Post Tensioned slabs
  • Precast Walls

Thirty8 Albert Ave

Client – Wu International

Architect – PTW

Builder – Probuild

Year – Completed in 2015

Construction Cost – $70,000,000

 

Engaged by Probuild as part of a D&C team, Structural Design Solutions were brought on board to provide faster, more cost-effective designs. The engagement includes full Structural and Civil design documentation.

 

The key structural engineering features of this project are:

  • 4 Basement Excavation
  • Ground floor retail
  • Level 2 and 3 retail and public use spaces
  • Medical Office Tower
  • Residential Tower
  • 4,800 sqm site
Levitra, vardenafil original contrareembolso en España, levitra sin receta online. Cialis es efectiva aproximadamente durante 24 horas.

Governor Place

Client – Morris Developments and Doma Group

Architect – Dezignteam

Builder – Morris Construction

Year – Completed in 2015

Construction Cost – $30,000,000

 

Governor Place is a residential development with 136 apartments. The developments consists of two, seven story buildings over a common two-level basement..

 

The key structural engineering features of this project are:

  • Low-strength rock fault zone through site
  • Piled and pad foundations
  • Precast wall loadbearing walls
  • Precast transfer walls
  • Post Tensioned slabs